best answer > What are the seven types of Muda?- QuesHub | Better Than Quora
  • What are the seven types of Muda?

    Questioner:Ava Patel 2023-06-08 04:10:53
The most authoritative answer in 2024
  • Lucas Kim——Works at the International Development Association, Lives in Washington, D.C., USA.

    Hello, I'm Kimi, a specialist in lean manufacturing and process improvement. Lean manufacturing is a philosophy derived from the Toyota Production System, which aims to minimize waste within a manufacturing system without sacrificing productivity. One of the key concepts in lean manufacturing is the identification and elimination of Muda, which is a Japanese term for waste. In the context of lean manufacturing, there are seven types of Muda that are commonly identified:


    1. Overproduction: This is considered the worst form of waste because it leads to excess inventory and ties up capital. Overproduction occurs when more products are made than are needed or can be sold in a given time frame. It can also lead to increased storage and handling costs, as well as the risk of obsolescence.


    2. Waiting: This waste occurs when there is idle time within the production process. It can be due to a lack of materials, equipment downtime, or delays in information flow. Waiting time not only reduces productivity but also increases lead time, which can negatively impact customer satisfaction.


    3. Transporting: This refers to the waste of resources involved in moving materials or products from one place to another within the production facility. Unnecessary transportation can increase the risk of damage to products, lead to delays, and consume valuable time and energy.


    4. Inappropriate Processing: This type of waste includes any activities that do not add value to the product or service. It can involve over-processing, using inappropriate techniques, or applying excessive precision that is not required by the customer.


    5. Unnecessary Inventory: Holding excess inventory ties up capital and space, and it can lead to obsolescence and increased storage costs. Unnecessary inventory can also mask other problems within the production process, such as poor quality or inefficient processes.


    6. Unnecessary / Excess Motion: This waste is related to the movement of people or materials that does not contribute to the value of the product. It can be caused by poor layout design, inefficient work processes, or the need to search for tools or materials.

    7.
    Defects: The waste of defects is perhaps the most obvious form of Muda. Defective products require rework or scrapping, which consumes additional resources and time. Defects can also lead to customer dissatisfaction and damage to the company's reputation.

    Eliminating these seven types of Muda is a continuous process that involves the entire organization, from the shop floor to management. It requires a commitment to ongoing improvement, the involvement of all employees, and the use of various lean tools and techniques to identify and remove waste.

    read more >>
    +149932024-05-18 13:52:38
  • Charlotte Anderson——Studied at the University of Zurich, Lives in Zurich, Switzerland.

    The seven wastes consist of:Overproduction. Simply put, overproduction is to manufacture an item before it is actually required. ... Waiting. Whenever goods are not moving or being processed, the waste of waiting occurs. ... Transporting. ... Inappropriate Processing. ... Unnecessary Inventory. ... Unnecessary / Excess Motion. ... Defects.read more >>
    +119962023-06-12 04:10:53

People also ask:

READ MORE:

QuesHub is a place where questions meet answers, it is more authentic than Quora, but you still need to discern the answers provided by the respondents.

分享到

取消